Swinton Insurance – Manchester

Client: TSK

Project: Swinton Insurance – Manchester

Project Description:

CAT B fit out to 101 Embankment in the centre of Manchester. The scheme was over 6 floors which provided office space and a break out area to the ground floor.

The installations included:

Mechanical

  • Full design
  • Ventilation
  • VRF System
  • Hot & Cold Water Systems
  • Chilled Water
Electrical

  • Full Design
  • Underfloor Busbar Systems
  • General and Emergency Lighting
  • Fire Alarm System
  • CCTV
  • Door Access Systems

Project Duration: 18 Weeks

Project value: £870,000

Client Comments