UTC Project – Warrington

Client: ISG

Project: UTC – Warrington

Project Description:

Installation of a fully exposed mechanical & electrical system to five floors of teaching space, including and engineering facility to the ground floor area.

The installations included:

Mechanical

  • Full design
  • Ventilation
  • VRF System
  • Hot & Cold Water systems
  • Dry Risers
  • BMS
  • AOV Smoke System
Electrical

  • Full Design
  • Electrical Installation – General
  • General, Emergency & External Lighting
  • Fire Alarm System
  • Intruder Alarm & CCTV System
  • Access Control
  • Data Systems

Project Duration: 25 Weeks