DAC Beachcroft – Birmingham

Client: Claremont

Project: DAC Beachcroft – Birmingham

Project Description:

Refurbishment of the 3rd, 4th and 5th floors of Tricorn House Birmingham.

The installations included:

Mechanical

  • Full design
  • Ventilation
  • AET Flexible Space System
  • Gas Suppression Systems
  • Gas Extract System
  • Leak Detection System
  • Air Conditioning Systems
Electrical

  • Full Design
  • Underfloor Busbar Systems
  • General and Emergency Lighting
  • Fire Alarm System
  • Aspirating Systems

Project Duration: 20 Weeks

Project value: £560,000